Tomorrow morning I will bring a few more arm load of wood inside. The half cord is on my patio under the deck about 15' from the door. Shouldn't need all that much since it will be warm (27-28 F). Storm prep here on Mount Desert Island will be to repair the brace that supports the ridge pole for the cover on the power boat. The sailboat looked fine this afternoon. Snow clearing should take about 30 minutes Saturday morning assuming I do the road too. We had a 20" snow fall at the end of December, so this won't be anything particularly bad