This will hold my 65' of chain if all goes as planned. The area to the right of the bucket is the "sponge out" area as the chain waters will flow through the bottom of the bucket, down channels into the sponging area. All will be epoxy filleted in side and epoxy sealed with 205/207...in theory, eh?