with a rubbing compound and then putting a coat of wax on the entire hull. I sanded the all of the teak on the boat and my wife put on another coat of varnish on all of it. I replaced the preventers, worked on the traveler system and replaced the lines on the down haul and boom vang. Then I and worked on the rudder stop. In the after noon I took the main sail off the boat and inspected it for chafe and then reinstalled it on the boat. Finely, to finish off the boat projects for the day, I re-sewed the entire boat cover. I felt pretty good because I was able to finish off my project list. The weather was so nice that my wife and I then took the bikes and did a 12 mile bike ride around part of Mission Bay.