Cruising Sailors Forum Archive

All working and ready to deploy!

Some interior work remains, like a cover for the wire run by the nav table and a housing for the motor over the V-berth. And a hose connection to the wash-down which is perhaps more needed with a windlass?

The steel angle being cut in the photos is a bracket for a header in the kitchen where there's no room for a jack stud. Cost a good bit to have a 12- or 15-gauge one fabricated. This 1/4" piece cut off a 19' surplus angle cost $10.

Messages In This Thread