Down to a knot fore reaching would be a nice speed but most boats would likely need very minimal main sail area up to do that, especially as wind speeds get beyond say 40 knots. I wonder if most slab reefed mains can be reefed that small, and also if the new in mast or boom furling mains are better for this as they could be reefed to trysail size. Does Brendon point a bit higher fore reaching than hove to?