The loads are high but the durations aren't long. The longest is generally when raising the main. Otherwise you're pulling the lines directly by hand until you need to take up the final loaded portion for adjustment. Letting out the lines you let them slip without power, same as without motorized winches.
I do think you need to allow for more recharge times or capacity.