Your lead to and from the winch. The lead from the main to the winch must come from the below the winch -- or if you wrap the winch, then you'll have a override which is (as you know) not acceptable.
Have you considered a variation on putting the lines simply from the boom end through the traveller and keep all of the sheet actions aft of the wheel?